Simply apply it to keep your building cool.

Heat-shielding and cooling film

Maximum -40 degrees maximumminus Maximum -40℃

Even when roof temperatures reached nearly 80℃, a cooling effect of up to 40℃ was achieved in the film-applied areas. Patent
Application in progress

  • Reflects near-infrared light Blocks heat penetration
  • Roof and interiorStrongly suppresses temperature rise
  • Greatly contributes toEnergy saving and CO2 emissions2 reduction
FLIR thermal image. Temperature distribution of the construction area.
Temperature comparison using thermal imaging

Performance, cost, and ease of installation.
The "obstacle" that was preventing ideal heat management.

The extreme heat in factories and warehouses during the summer months poses a serious threat to the safety and productivity of workers.
On the other hand, conventional heat-shielding measures have faced significant obstacles due to high construction costs and maintenance burdens.

Such challenges related to "heat",
issues like these?

Task
01
Illustration illustrating the deterioration of working conditions

Deterioration of working conditions

"I can't stand the heat in warehouses and factories..."
Rising temperatures can lead to decreased employee performance and increased risk of heatstroke.

Task
02
Illustration illustrating rising costs

Rising costs

"The electricity bill for the air conditioning in our office has skyrocketed…"
Electricity costs have increased due to excessive use of air conditioning.

Task
03
Illustration showing equipment trouble

Equipment trouble

"The outdoor electrical equipment suddenly broke down..."
Deterioration and shutdown of control panels and infrastructure due to thermal runaway.

Apply it to roofs, walls, windows, and fixtures to reduce heat. That is a heat-shielding cooling film.

Japan and logistics

  • factory factory
  • Logistics warehouse Logistics warehouse
  • Refrigerated / Frozen warehouse Refrigerated /
    frozen
    warehouse

public /
Commercial

  • public facility public facility
  • school school
  • office office

Special Infra

  • Data center Data center
  • Mode Buildings equipment
    buildings
  • live stock live stock

Only Advantec could make this happen!

01

Vacuum thin film technology

Uniform thin film formation ensures stable radiative cooling!

02

Cultivated in the semiconductor field Precision machining technology

Consistent quality!

03

Inorganic materials/thin film structure

Durable and resistant to deterioration even in outdoor environments!

04

Monomaterial design

Recyclable and environmentally friendly!

Schematic diagram of the protective, heat-reflective, and adhesive layer structure, and the adjustment of near-infrared reflection and visible light transmission.

Roof surface temperature up to 40°C*Suppression.
Amazing cooling data.

*At roof temperatures that rose to nearly 80°C,
A cooling effect of up to 40°C was confirmed in the film application area.

Demonstration effect

  • surface temperature drop maximum -40
  • internal temperature drop approx -5
  • Air conditioner
    power consumption
    14% reduction
  • Equipment trouble overheat
    Outbreak0Piece
Thermal imaging (FLIR) Graph showing temperature changes before and after construction.

Proven,
Certain Cooling performance and Cost-effectiveness

With its "easy installation," anyone can apply it anywhere—just stick it on.

Easy application: Thanks to a special adhesive,
The installation was completed quickly without leaving any wrinkles.

Step 1-1 Cleaning (for windows)

Step 1-1
Sprinkle water on the surface to be worked on and clean it with a scraper.

Cleaning (for windows)
Sprinkle water on the surface to be worked on and clean it with a scraper.

Step 1-2 Cleaning (for painted surfaces)

Step 1-2
Clean the work surface with high-pressure water, or clean the wiper/brush with water.

Cleaning (for painted surfaces)
Clean the work surface with high-pressure water, or clean the wiper/brush with water.

Step 2: Peel off the protective film and apply the application liquid to the adhesive surface.

Step 2
Remove the protective film and apply the application liquid to the adhesive surface.

Remove the protective film,
Apply the application liquid to the adhesive surface.

(*Water + approximately 0.1% neutral detergent)

Step 3: Apply the application solution to the surface, attach the film, and adjust its position.

Step 3
Apply the application solution to the surface, attach the film, and adjust its position.

Apply the application solution to the surface to be treated.
Apply the film and adjust its position.

Step 4: Apply the application solution to the film surface and scrape off the water.

Step 4
Apply the film

Apply the application solution to the film surface,Use a squeegee to remove water from between the film and the application surface.

Step 5: Cut the excess portion of the film to the correct dimensions.

Step 5
Cut the excess portion of the film to the correct dimensions.

Cut the excess portion of the film to the correct dimensions.

You can see the actual construction procedure in this video.
Please feel free to contact us if you are interested.

Even under salt damage and harsh environments
Durable
Highly durable design.

Environmental testing and durability testing

Evaluation targetWhite film, transparent film
ExaminationHigh-temperature testing, thermal cycling testing, high-humidity testing, combined cycling (salt spray) testing, weather resistance testing
Evaluation itemAppearance, peeling, optical properties, cooling performance

Durability test results

Examination Condition Assumed environment appearance Peeling off Optics Cooling performance
High-temperature test 80℃ 1000 hours
  • storage container
Anomaly
None
None change
None
change
None
Thermal cycling test 80°C / -40°C
(24-hour cycle)
1000 hours
  • Speed ​​Region
  • Shipping containers
Anomaly
None
None change
None
change
None
High humidity test 65℃ 95%RH
1000 hours
  • tropical region
  • Shipping containers
Anomaly
None
None change
None
change
None
Combined cycle testing Salt spray
Repeating 480 hours
  • Direct sunlight
  • Salt-damaged environment
  • Anti-corrosion effect
Anomaly
None
None change
None
change
None
Weather resistance test Sunshine
Carbon arc test: 500 hours
  • Direct sunlight
  • rainfall
Anomaly
None
None change
None
change
None

Choose according to the object

Two lineups

White type

White type: Installation image for outdoor equipment
Target
Rooftop, exterior walls, outdoor equipment (power conditioners, etc.), air conditioner outdoor units
Advantages
In summer, 20℃ cooling effect Demonstrated.
appearance
A calm white color that can also be used as an alternative to outdoor paint.

Transparent type

Transparent type: Installation image on window glass
Target
Window glass, sunroofs, office buildings, houses
Advantages
Achieves both high heat-shielding effect and transparency. Also blocks UV (ultraviolet) rays. Cuts over 99%.
appearance
It's difficult to see inside from the outside (mirror effect), but the view is clearly visible from inside.

Construction examples

White film

Factory/warehouse construction example

Exterior view of a logistics warehouse in Yamanashi Prefecture
Roof of a logistics warehouse Inside a logistics warehouse

Target of construction: Yamanashi Prefecture, Logistics Warehouse, Roof and Exterior Walls: Total 800 m²

product: COOL-EARTH

Construction method: Slit construction method (flat area 533 m²)

Implementation date: June 2025

  • Roof: Before construction 80℃ → After construction 48℃
    Cooling effect -32℃
  • Warehouse temperature: Average temperature drop of 5°C, peak drop of 10°C
  • Slit construction for corrugated metal roofs and corrugated exterior walls
    Materials -32% reduction

Roof temperature (comparison with and without film)

Roof temperature graph (comparison before and after film application)

Cost-effectiveness as demonstrated by case studies

  • White film can be applied to the roofs and exterior walls of factories and warehouses to cool the interior.
  • A comment from the site: "It got cooler as soon as construction started."
  • This slit construction method can accommodate various roof and exterior wall shapes, reducing material costs.
  • Overheating of solar power conditioners was also eliminated through this installation.
  • Even with air-conditioned facilities, power consumption has been reduced by 14%.
  • Compared to installing air conditioning, the initial cost is lower, and it provides continuous benefits with zero running costs.

Slit construction method

Slit construction method construction image 2 Slit construction method construction image 1

Examples of completed projects (containers, outdoor units)

Examples of construction on containers Installation example for outdoor units 1 Installation example for outdoor units 2

Effectiveness of countermeasures against solar power conditioner overheating

8 months before construction 12 months after construction
overheat 17 times 0
Power generation loss (kWh) 88 0
Restoration costs (1,000 yen) 340 0

transparent film

Office and residential window installation examples

Exterior view of an architectural design office in Ehime Prefecture
Window installation image for an architectural design office (1) Window installation image for an architectural design office (2)

Target of construction: Ehime Prefecture, Architectural Design Office, Window Glass, Approx. 100 m²

product: COOL-EARTH

Construction method: Exterior cladding on the first floor, interior cladding on the second floor.

Implementation date: June 2024

  • Indoor temperature: 5°C decrease Even with the air conditioning on 3°C decrease
  • Power consumption of the air conditioner: 30% reduction
  • It becomes more difficult to see inside from the outside. Security benefits + Allows for natural light

Cooling effect that can be felt even with the air conditioner on.

Temperature data with the air conditioner on (comparison before and after film application)

Cost-effectiveness as demonstrated by case studies

  • Simply applying this transparent film to the windows of offices and homes will cool the room by 3-5°C.
  • Customer feedback: "The afternoon sun isn't too hot. You can't see inside from the outside, so I can open the curtains and the room is brighter."
  • It produces the same effect whether applied to the exterior or interior.
  • It has been proven that it does not cause "thermal cracking" in winter, so you can install it with peace of mind.
  • Construction costs are a major obstacle for small-scale projects. With our professional-level video manuals, you can even do it yourself.
  • It's perfect for a small-scale start.

You can see outside from inside, but you cannot see inside from outside.

Construction image where the interior cannot be seen from the outside. Construction image showing the view from inside to outside.

Construction examples (offices, residences)

Examples of office construction projects Examples of construction projects in residential buildings (1) Examples of construction projects in residential buildings (2)

Example of cost-effectiveness for construction (approximately 10 m² of window glass)

before construction After construction Advantages
Preset temperature 25 ℃ 28 ℃
Power 4560kwh 3192kwh -1368kwh
electricity rates 145,900 yen 102,100 yen -43,800 yen

Comparison with conventional heat-reflective coatings and films.

Cool Earth® (Our company) Insulation sheet heat-shielding paint
Cooling performance
-10℃ at 40℃
Insufficient effect
○〜△ Approximately -5℃
Estimated cost (materials and labor)
(Disadvantaged in the life cycle)
appearance
Good condition
△〜× Wrinkle concerns
Concerns about uneven paint application
Workability
Easy application with water
Air bubbles are easily formed.
Surface preparation is required.
Durability
Passed the exam equivalent to 13 years of study.
△〜× Insufficient heat and moisture resistance
Deteriorates in 2-3 years
Environmental friendliness
○〜◎ Monomaterial/Recoverable
Composite materials are difficult to reuse.
Not reusable

*What is monomaterial?: It is made from a single material and can be reused.

Please feel free to contact us first.

Tailored to your company's challenges
We will propose the most suitable plan for you.

  • Film purchase and quotation
  • Request for construction services
  • Product customization requests
  • Application to your company's products and partner collaborations
The view of the residential area from the window